Name | Tags | Extremely rough guesstimate (days) |
|---|---|---|
Finality Certificate Exchange Protocol | F3networkingOpen Problem | 10 |
Finality Certificate Format | F3Open Problem | 10 |
Power table/State format | F3Open Problem | 10days |
Sync and checkpoint API | Lotusunblocked | 3 |
F3 module | F3unblocked | 8 |
PubSub Integration | LotusF3networking | 5day |
EC notifying F3 about new tipsets | Lotus | 3days |
Create Lotus Module for f3 | Lotusunblocked | 2 |
Passive F3/Granite listener | F3 | 4 |
Message/VRF Signing wiring | LotusF3 | 1day |
Granite outputs a signal when new finalization happens (integrate granite loop with F3 module) | GraniteF3 | 1 |
Certificate Store | F3 | 5days |
Test framework in lotus | Lotus | 10 |
Certificate Export with snapshots | 3days |